All the detail fine tuned with the correct lighting, Planahome bespoke furniture and porcelain tiles to the walls and floor. All including the in-house Planahome qualified and trained for detail, directly employed work force. The room was stripped back to floor boards and bare walls before rebuilding to these fine standards of a long term fully functioning master shower room.
The whole process took 15 working days with impressive results. Note the beautiful pure laminate, easy to maintain shower wall finish within the walk in shower.